久久精品国产一区二区电影,久久精品国产亚洲av瑜伽,精品无人区一码卡二卡三,久草热8精品视频在线观看 ,久久99精品久久久久麻豆

錘子簡(jiǎn)歷品牌推廣師
裝配工藝工程師個(gè)人英文簡(jiǎn)歷
作者:錘子簡(jiǎn)歷 2024/12/09 11:47:06
閱讀 29

簡(jiǎn)歷模板

一份專業(yè).詳實(shí)的個(gè)人簡(jiǎn)歷,是裝配工藝工程師向潛在雇主展示自己技能與經(jīng)驗(yàn)的最佳方式,下面是錘子簡(jiǎn)歷精心整理的最新裝配工藝工程師個(gè)人英文簡(jiǎn)歷參考,希望能夠幫助到大家。

裝配工藝工程師個(gè)人英文簡(jiǎn)歷參考:

Interested position:Assembly Process Engineer   

Educational 

Time: 201X.9-201X.7

School name: University of Dreams 

Professional name: Vehicle Engineering  

Work Experience

Time: 201X.4-present

Company Name: Guangzhou Huanzhu Resume Production Co., Ltd.

Position: Advanced Free Consultant 

Assembly Shop and Body Shop’s Industrial Engineering work, new car model project and series production’s cycle time analysis, Ergonomic analysis and assessment.

Generate the required files or data according to the analysis result.

Prepare for the analysis activity, make work schedule, follow up and feedback

Workload/utilization calculation, analysis.Operator’s efficiency calculate, headcount calculation.

Potential improvement proposal, production line balance proposal.

Delivery the Industrial Engineering work result to project team/production department/responsible person.

Time: 201X.1-201X.3   

Company Name: Guangzhou Huanzhu Resume Production Co., Ltd.

Position: Assembly Process Senior Engine 

Process solution study, economic evaluation and analysis to obtain the best solution

Product description and new car components analysis

Make investments evaluation about specific competence areas

Pre-method definition and Standard BOP application

Control point definition (according to quality) for the main important elements

Lay out definition

Tech spec definition for specific competence areas according to Standard, investments, quality, timing request Suppliers offers analysis

Suppliers equipment timing (design and construction) monitoring and control

Suppliers equipment installation monitoring and control

Manufacturing Assembly Engineering Standard equipment application in the new models/project

Operation sheets execution

Cooperation with Handling department for Racks definition

Equipment definition about quality control according to Control Plan

Process FMEA execution

Time: 201X.10-201X.1  

Company Name: Guangzhou Huanzhu Resume Production Co., Ltd.

Position:Assembly Process Supervisor Engineer  

Responsible for the overall work of Assembly process and technology.

Participate in Assembly process planning, include process flowchart, cycle time calculation, capacity planning, fixture & equipment planning, Project investment budget control.

Responsible for engineering and technological research of new product, new process and new equipment, process validation

Responsible for planning area equipment, and preparing the relative RFQ.

Prepare the assembly process procedures.

Technical support on site, and trouble shooting of quality issues.

Participate in the design of new product (line) and new process, and responsible for manufacturing management of workshop.

Responsible for technical planning modification and trouble shooting during pre-production.

Prepare and apply the assembly corrective plans and inspection.

Monitor the technical change in process operation and process procedure .

Responsible for analyzing and pushing problems solving on site.

Time: 201X.5-201X.9 

Company Name: Guangzhou Huanzhu Resume Production Co., Ltd.

Position:Adv.Sp.Process Planning

Process Planning for Assembly Shop and new model

Handles series production documents for all model ranges.

Handles launch documents from process side for all launches of new model ranges.

Responsible for project: extension project, new model launch and integration

Responsible to SB/WE: prepare SBM, documentation, tooling, follow T-car building, solve the launch problem

Handles technical correspondence EMCC,following introduction date of technical changes from process side

In charge of advising design, construction and change of tools, jigs and fixtures.

Be the central consignee for all technical problems.Such as, issues enquiries of the assembly plant to BMW AG, receives the corresponding information and implements it with the partner.

Coordinates and controls all issues of back supplies during the assembly process

Time: 201X.7-201X.4   

Company Name: Guangzhou Huanzhu Resume Production Co., Ltd.

Position:Assembly Process Engineer

Process planning of Assembly Shop

Appraisal process and edit SE for all launches of new model ranges.

Constitute process layout and edit the operation process card.

Tender new equipment, technology assessment, contract validation, drawings and countersigned, organizational acceptance.

Edit P-FMEA and Control Plan of new project.

Offer technical support for the operator training

Be the central consignee for all technical problems.As such, issues enquiries of the assembly plant to relevant department .

Constitute the project team for the problems and coordinate and controls relevant department.

Project Experience

Time: 201X.8-201X.1   

Project Name: Huanzhu Resume Creation Case

Project Role: Automobiles Industry Consultan 

Description: BMW All New X3 launch at Shenyang Plant's Body Shop

Responsibility: G08 Body Shop Cycle time Caculation and Continuous Improvement

Achievement:Reduce 1 operator according Cycle time Caculation results

Time: 201X.4-201X.7   

Project Name: Huanzhu Resume Creation Case

Project Role: Automobiles Industry Consultan 

Description: BMW All New 3 Series launch at Shenyang Plant

Responsibility: G28 Assembly Shop Cycle Time and Ergonomic evaluation

Time: 201X.1-201X.3  

Project Name: Huanzhu Resume Creation Case

Project Role: FCA Asia Pacific Investment Co  

Description: Jeep K8 launch at Changsha Plant

Responsibility: Resbonsible for Chassis area process planning, Generate work instruction, equipment planning and pruchasing, online problems solving.Resbonsible for Assembly Shop Manipulator equipment planning and pruchasing, online problems solving.

Time: 201X.10-201X.1 

Project Name: Huanzhu Resume Creation Case

Project Role: Volvo(China) Investment Co.,Ltd  

Description: Geely & Volvo's develop a whole new branch called LYNK & CO, CX11 is the 1st SUV product of LYNK & CO.

Responsibility: Responsible for HBMP HAMP-HIGH HAMP-LOW's Equipment planning of Luqiao Plant.

self-evaluation

I'm good at driving, proficient in MS-OFFICE.AUTOCAD and CATIA etc.I have strong communication skills and can work under high pressure.I am familiar with whole auto chassis parts & structure, familiar with simultaneous engineering process during R&D's 4 phases.

簡(jiǎn)歷模板

文/錘子簡(jiǎn)歷

精美簡(jiǎn)歷模板,來自錘子簡(jiǎn)歷:www.90xin.cn

錘子簡(jiǎn)歷(100chui.com),專業(yè)簡(jiǎn)歷制作

著作權(quán)歸作者所有,轉(zhuǎn)載請(qǐng)聯(lián)系作者獲得授權(quán)。

內(nèi)容來源說明:本文章來自網(wǎng)絡(luò)收集,如侵犯了你的權(quán)益,請(qǐng)聯(lián)系QQ:2772182309進(jìn)行刪除。
智能在線簡(jiǎn)歷編輯器
錘子簡(jiǎn)歷在線簡(jiǎn)歷制作,一鍵導(dǎo)出,快速生成 專屬你的優(yōu)秀求職簡(jiǎn)歷,敲定高薪 Offer~
立即創(chuàng)建簡(jiǎn)歷

【使用錘子簡(jiǎn)歷小程序制作簡(jiǎn)歷】

范文模板 更多>